We will be continuing in with the sheetrocking tomorrow (Monday). They've been good about keeping the street clear of truck congestion and hopefully they will keep it up as they move ahead. It is estimated that they'll need another week or so, possibly more.
Our exterior painter should be here as well with his own truck, but, as always, the 9 Dos Posos driveway will be used for any additional parking needs from the site.
Sunday, February 28, 2010
Thursday, January 28, 2010
Interior Insulation
The interior insulation will begin Monday as well as the siding (see post below). This will mean more vans/trucks that will need to find parking. We'll do our best given the limited space!
Siding To Be Installed
Early next week, the siding contractor will begin putting the siding on the house. The material has already been delivered and moved on site, but this will still mean that, undoubtedly, a few more trucks than usual will be in need of parking. We're told the paved turnout at the base of 8 Dos Posos - though vacant - is not available for public use, so we'll do our best to accomdate the increase in vehicles. The process as a whole should probably take a week or so, but it's hard to tell given the weather of late.
Subscribe to:
Posts (Atom)